Northumbrian Water has gone out to tender with an AMP7 contract for its concrete repairs framework worth an estimated £40 million in total.
The water company is looking for expressions of interest from suppliers to join the framework for concrete repair services in both the Northumbrian Water (NW) and Essex and Suffolk Operating Areas.
The framework covers professional engineering, advisory, and design consultancy services including structural and asset condition surveys and reports, scope definition, materials testing and analysis.
Works to be provided under the contract include:
- repair and refurbishment of service reservoirs, water towers, raw water retaining structures, aqueducts, river structures and water and sewage treatment works process tanks
- internal and external repairs, application of coatings and linings to steel and concrete structures together with other associated minor engineering works
The framework will be for an Initial contract term is 4 years with the option of two further 2-year extensions
Deadline for receipt of tenders or requests to participate is 13th November 2020 – click here to access the tender documentation.
Craig Nienaber, Business Development Manager for Safe Access Solutions (SAS) at HUBER Technology, explores why the company is seeing a growing level of interest in its safe access solutions for critical infrastructure providers, including their application in wastewater treatment assets.

Southern Water has released film and images showing what it’s like to walk inside Hampshire’s expanded Yew Hill underground reservoir for the very last time, before it gets filled with water.
Hear how United Utilities is accelerating its investment to reduce spills from storm overflows across the Northwest.