NI Water has gone out to tender with a wide-ranging contract for instrumentation, control and automation (ICA) equipment and spare parts worth an estimated £20 million.

The contract is being tendered in 8 separate Lots for the supply and delivery of:
- Lot 1 – Magnetic Flowmeter Equipment and Spare Parts
- Lot 2 – Ultrasonic Flow Measuring Equipment and Spare Parts
- Lot 3 – Ultrasonic Level Measuring Equipment and Spare Parts
- Lot 4 – Chlorine Measuring Analytical Equipment and Spare Parts
- Lot 5 – Turbidity Measuring Analytical Equipment and Spare Parts
- Lot 6 – Dissolved Oxygen Analytical Equipment and Spare Parts
- Lot 7 – Mixed Liquor Suspended Solids Analytical Equipment and Spare Parts
- Lot 8 – Multi parameter Analytical measurement instrument and Spare Parts
Initial contract period is 2 years with the option to extend for a further 2 annual extensions.
Time limit for receipt of tenders or requests to participate is 19 February 2024 – click here to access the tender documentation.
Craig Nienaber, Business Development Manager for Safe Access Solutions (SAS) at HUBER Technology, explores why the company is seeing a growing level of interest in its safe access solutions for critical infrastructure providers, including their application in wastewater treatment assets.

Southern Water has released film and images showing what it’s like to walk inside Hampshire’s expanded Yew Hill underground reservoir for the very last time, before it gets filled with water.
Hear how United Utilities is accelerating its investment to reduce spills from storm overflows across the Northwest.