High Speed Two (HS2) Ltd has gone out to tender for suppliers to undertake Water Framework Directive assessment surveys.
A WFD assessment of the HS2 proposed scheme has previously been undertaken for surface water and groundwater bodies as part of the main and supplementary environmental statements.
The previous WFD assessments were largely undertaken with desk based information. HS2 Ltd previously commissioned surveys of water bodies along the Phase One line of route to supplement the desk based assessment and confirm some of the conservative assumptions made within the Environmental Statements. The assessment to date has identified a number of locations where further survey and assessment is required.
The HS2 Technical Directorate Environment Team now requires an external organisation to undertake these surveys, resulting in a series of reports for each site.
Interested suppliers will first need to register with the HS2 eProcurement portal BravoSolution.
For more information click here
Uniwater has acquired Hy-Ram Engineering, a specialist in tooling, products and hire for the water sector, based in Mansfield, England.
Near-real-time microbial monitoring of wastewater discharge and bathing waters is now possible thanks to the BactoSense ID solution created by Swiss-based bNovate Technologies.

Southern Water has released film and images showing what it’s like to walk inside Hampshire’s expanded Yew Hill underground reservoir for the very last time, before it gets filled with water.
Hear how United Utilities is accelerating its investment to reduce spills from storm overflows across the Northwest.