Print this page
Friday, 25 August 2023 10:11

United Utilities seeks supplier input on £30 million Gas to Grid plant plans to export biomethane to UK gas network

United Utilities is seeking supply chain input on its plans to install new Gas to Grid upgrading plant with a Biomethane / CO2 carbon capture (liquified) that takes all the on-site generated gas (~ 6000nm3/hr) from its existing anaerobic digestion storage for export into the gas network.

UNITED UTILITIES BIOGAS DOMES MANCHESTER

As part of developing its future strategy the water company is undertaking pre-market research to understand market offerings for a wide range of services and equipment. Initial design for the main plant items includes:

  • Dual stream 'Amine solution' Chemical wash plant
  • Grid Export Unit (GEU) – kiosk based solution
  • Remote Operating Valve (ROV) assembly – kiosk based solution
  • CO2 capture / recovery Plant (off- gas product of the Chemical Wash Plant)
  • Propane storage facility
  • Dual fuel boiler (H2 and natural gas)
  • H2 import pipeline to dual fuel boilers
  • New electrical feed

 

United Utilities are interested in understanding how the model can be delivered and the best technical solution - responses detailing variations of the outline design are welcome. Current estimated total value is £30 million.

The water company has issued a Periodic Indicative Notice - at this stage the notice is a request for information only. Deadline for companies with experience in this area to respond is 22 September 2023.

Estimated date of publication of the formal contract notice is 6 November 2023.

Click here to access the Periodic Indicative Notice documentation.